Equipment Foundation Design – Calculations, 3D Model and Fabrication Drawings
Our equipment foundation design work covers static equipment, pumps, compressors, fans and tanks, with each foundation sized for the loads, vibration limits and soil conditions it will actually see. Calculations and reinforcement drawings are issued together.
We design equipment, pump, compressor and tank foundations, including dynamic analysis for vibrating machines.
Also searched as: pump foundation, machine base.
Last updated:
Request Engineering Support
Typical response within 24 hours · Confidentiality assured
SLETEC portfolio
Project Evidence — Structural, Civil, Platforms & Access Systems
Selected engineering evidence from SLETEC projects. Client names and identifiers are withheld for confidentiality.
Scope
Platforms, racks, supports, anchors, foundations, skids
Codes
AISC 360 · AWS D1.1 · ACI 318 · ASCE 7 · SBC
Deliverables
Structural calcs, steel & foundation drawings, MTO
What we deliver
Send us your data sheet, sketch or old drawing on WhatsApp (+966 55 545 8298) or email (enquiry@sletec.com) for a fixed-price quote, usually within 24 hours.
Inputs for machine foundation design
We need the vendor load data and the geotechnical report before sizing anything. For rotating equipment, the vendor's machine mass, rotor mass, operating speed and unbalanced forces are essential, because the dynamic check cannot be done without them.
Missing data is common on brownfield jobs. In that case we state conservative assumptions in the design basis and flag them for confirmation.
Codes for ACI 351.3 foundation and anchor bolt design
Each code has a clear role, and the report cites them by topic so a reviewer can follow the logic.
| Code | What it governs |
|---|---|
| ACI 351.3 | Dynamic foundations: frequency separation, vibration amplitude limits, mass ratios |
| ACI 318 | Reinforced concrete design and anchor design to the concrete anchorage chapter |
| SBC 304 | Concrete design for projects in Saudi Arabia |
| ACI 351.2 | Foundations for static equipment such as vessels, exchangers and tanks |
| Client specification | SAES or company standards for grout, pedestals and anchor details where they apply |
Pump foundation and compressor checks
A pump foundation is usually a rigid block, and we confirm that its natural frequency is well away from the running speed and that the soil bearing pressure is acceptable. Reciprocating compressors need more: unbalanced forces and moments are applied in a dynamic model and the amplitude is compared with the vendor and ACI 351.3 limits. Anchor bolt design covers tension, shear, concrete breakout and pull-out, with sleeves where alignment adjustment is required.
Problems found on existing foundations
Cracked grout, loose anchor bolts and high vibration readings on a pump that was replaced with a larger unit are the usual reasons we are called in. See our civil foundation drawing project and the fire water pump skid vibration project for examples of this work.
Related engineering topics
steel structure design, structural calculations, steel platform FEA and structural steel detailing.
Frequently Asked Questions
Can you design a equipment foundation for our project?
Yes. We prepare calculations and drawings to ACI 318, ACI 351.3, SBC 304 and your project specification.
Do you take small jobs?
Yes. Single drawings, one calculation or a check of an existing design are welcome.
Which countries do you serve?
Saudi Arabia, UAE, Qatar, Oman, Kuwait, Bahrain and worldwide.
Related pages
Serving all GCC countries
Send your sketch, photo or PDF today
One drawing or a complete design package — we reply with a fixed-price quote, usually within 24 hours.
Request Engineering Support
Typical response within 24 hours · Confidentiality assured