Our Portfolio

Engineering Projects

Engineering design, analysis and documentation for oil & gas and industrial clients — from API 650 tank rehabilitation to multi-silo systems and CFD-optimised industrial plants.

HomeProjects
80+Project References
50+Evidence Sheets
15+Years Experience
20+Workflow Controls

Featured Projects

Engineering packages delivered to international standards

76 projects found

ENGINEERING PACKAGE FOR STRESS ANALYSIS & SHELL PLATE REPAIR. Engineering package for stress analysis & shell plate repair

ENGINEERING PACKAGE FOR STRESS ANALYSIS & SHELL PLATE REPAIR. Engineering package for stress analysis & shell plate repair

CONFIDENTIAL

Send Enquiry
Method of Statement for Repair of Bottom, Roof Plates & Roof Structure for Tank M13-D-681-2

Method of Statement for Repair of Bottom, Roof Plates & Roof Structure for Tank M13-D-681-2

CONFIDENTIAL

Send Enquiry
Reverse Engineering & Structural Analysis of Toyota FJ40 Chassis

Reverse Engineering & Structural Analysis of Toyota FJ40 Chassis

Send Enquiry
Advanced Engineering Design Package – Vacuum Residue Storage Tank (J60-D-0711)

Advanced Engineering Design Package – Vacuum Residue Storage Tank (J60-D-0711)

CONFIDENTIAL

Send Enquiry
Multi-Silo Storage System Design, Structural Analysis & CFD Simulation

Multi-Silo Storage System Design, Structural Analysis & CFD Simulation

CONFIDENTIAL

Send Enquiry
Wet Concrete Batching Plant Engineering (120–500 m³/hr)

Wet Concrete Batching Plant Engineering (120–500 m³/hr)

Send Enquiry
Development of FFS study for sphere | API 579-1 / ASME FFS-1

Development of FFS study for sphere | API 579-1 / ASME FFS-1

CONFIDENTIAL

Send Enquiry
Analysis of the collapse of the floating roof of a storage tank

Analysis of the collapse of the floating roof of a storage tank

CONFIDENTIAL

Send Enquiry
Design verification of an Oxygen filter | FEA & ASME VIII

Design verification of an Oxygen filter | FEA & ASME VIII

CONFIDENTIAL

Send Enquiry
Review of Calc's, DWG's, Material Specifications and Special Studies of 7 PV

Review of Calc's, DWG's, Material Specifications and Special Studies of 7 PV

CONFIDENTIAL

Send Enquiry
Preliminary Design of 6000 m3 Bilobular Tank

Preliminary Design of 6000 m3 Bilobular Tank

CONFIDENTIAL

Send Enquiry
Bulging Analysis of three Storage Tanks | API 650 - API 653

Bulging Analysis of three Storage Tanks | API 650 - API 653

CONFIDENTIAL

Send Enquiry
Mechanical Calculation, Design and EN13445 Compliant Verification

Mechanical Calculation, Design and EN13445 Compliant Verification

CONFIDENTIAL

Send Enquiry
Creep and Fatigue Analysis for a 180 degree curve in a crude oil furnace | FEA

Creep and Fatigue Analysis for a 180 degree curve in a crude oil furnace | FEA

CONFIDENTIAL

Send Enquiry
Mechanical Calculation of 2 Pig Traps | ASME VIII Div. 1

Mechanical Calculation of 2 Pig Traps | ASME VIII Div. 1

CONFIDENTIAL

Send Enquiry
Mechanical Calculation of Storage Tank | Finite Element Analysis

Mechanical Calculation of Storage Tank | Finite Element Analysis

CONFIDENTIAL

Send Enquiry
Detailed FEA Analysis of the Lifting Devices of two Coke Drums

Detailed FEA Analysis of the Lifting Devices of two Coke Drums

CONFIDENTIAL

Send Enquiry
Thermal Design of a Shell and Tube BEM Heat Exchanger

Thermal Design of a Shell and Tube BEM Heat Exchanger

CONFIDENTIAL

Send Enquiry
Mechanical Calc. of Pressure Vessel's Components | 13-DA-07 Separator

Mechanical Calc. of Pressure Vessel's Components | 13-DA-07 Separator

CONFIDENTIAL

Send Enquiry
Technical Spec for Inspection, Alteration and Repair of Storage Tank | API 653

Technical Spec for Inspection, Alteration and Repair of Storage Tank | API 653

CONFIDENTIAL

Send Enquiry
Shell & tube heat exchanger bellow replacement | TEMA + ASME VIII-1

Shell & tube heat exchanger bellow replacement | TEMA + ASME VIII-1

CONFIDENTIAL

Send Enquiry
Aboveground Storage Tank inspection report tolerances validation | API 653

Aboveground Storage Tank inspection report tolerances validation | API 653

CONFIDENTIAL

Send Enquiry
HAZOP/FMECA + WHAT IF Study of a Voltage Regulation System

HAZOP/FMECA + WHAT IF Study of a Voltage Regulation System

CONFIDENTIAL

Send Enquiry
Thermal/Mechanical design of a high temperature cooler | TEMA + ASME VIII

Thermal/Mechanical design of a high temperature cooler | TEMA + ASME VIII

CONFIDENTIAL

Send Enquiry
Thermal/Mechanical analysis of the drive train of four (4) converters | FEA

Thermal/Mechanical analysis of the drive train of four (4) converters | FEA

CONFIDENTIAL

Send Enquiry
Design & calculation of seven (7) Pressure Vessels (filters) | EN13445

Design & calculation of seven (7) Pressure Vessels (filters) | EN13445

CONFIDENTIAL

Send Enquiry
Stress analysis of a Shell & Tube Heat Exchanger | ASME VIII-2 + FEA

Stress analysis of a Shell & Tube Heat Exchanger | ASME VIII-2 + FEA

CONFIDENTIAL

Send Enquiry
Static & Fatigue analysis of a compressor silencer | ASME VIII-2 + FEA

Static & Fatigue analysis of a compressor silencer | ASME VIII-2 + FEA

CONFIDENTIAL

Send Enquiry
Flange analysis: local failure, plastic collapse, fatigue | ASME VIII-2 + FEA

Flange analysis: local failure, plastic collapse, fatigue | ASME VIII-2 + FEA

CONFIDENTIAL

Send Enquiry
Stress, Flexibility & Supports of a Steam Piping System | ASME B31.1

Stress, Flexibility & Supports of a Steam Piping System | ASME B31.1

CONFIDENTIAL

Send Enquiry
Calculation & Detailed engineering of five (5) Pressure Vessels | ASME VIII-2

Calculation & Detailed engineering of five (5) Pressure Vessels | ASME VIII-2

CONFIDENTIAL

Send Enquiry
Maximum nozzle loads analysis in a S&T Heat Exchanger | WRC 537 + FEA

Maximum nozzle loads analysis in a S&T Heat Exchanger | WRC 537 + FEA

CONFIDENTIAL

Send Enquiry
Static & Fatigue analysis of S&T Heat Exchangers | ASME VIII-2 + FEA

Static & Fatigue analysis of S&T Heat Exchangers | ASME VIII-2 + FEA

CONFIDENTIAL

Send Enquiry
Floating Roof Calculation + Detail Engineering + Tolerances | API 650 & 653

Floating Roof Calculation + Detail Engineering + Tolerances | API 650 & 653

CONFIDENTIAL

Send Enquiry
HAZOP & FMEA Study of a Voltage Regulation System

HAZOP & FMEA Study of a Voltage Regulation System

CONFIDENTIAL

Send Enquiry
Thermal & Mechanical Analysis of a S&T Heat Exchanger

Thermal & Mechanical Analysis of a S&T Heat Exchanger

CONFIDENTIAL

Send Enquiry
Design & Calc's of Special Piping Supports - Refinery | Eurocode 3

Design & Calc's of Special Piping Supports - Refinery | Eurocode 3

CONFIDENTIAL

Send Enquiry
Design & Calc's of S&T Heat Exchangers | TEMA + ASME VIII-1

Design & Calc's of S&T Heat Exchangers | TEMA + ASME VIII-1

CONFIDENTIAL

Send Enquiry
Design & Calculation of 11 Bolted Structures | SBC-304

Design & Calculation of 11 Bolted Structures | SBC-304

CONFIDENTIAL

Send Enquiry
Design verification of a Water Storage Tank | FEA - Eurocode 3

Design verification of a Water Storage Tank | FEA - Eurocode 3

CONFIDENTIAL

Send Enquiry
Stress, Flexibility & Supports of a Steam Piping System | ASME B31.1

Stress, Flexibility & Supports of a Steam Piping System | ASME B31.1

CONFIDENTIAL

Send Enquiry
Stress & Flexibility Analysis of a Steam Piping System | ASME B31.1

Stress & Flexibility Analysis of a Steam Piping System | ASME B31.1

CONFIDENTIAL

Send Enquiry
Supervision of Storage Tank Bottom Replacement | API 650

Supervision of Storage Tank Bottom Replacement | API 650

CONFIDENTIAL

Send Enquiry
Calc's & Verification of 2 Pressure Vessels | ASME VIII Div.1

Calc's & Verification of 2 Pressure Vessels | ASME VIII Div.1

CONFIDENTIAL

Send Enquiry
Loading Analysis in Storage Tank as per API 650 | Eurocode

Loading Analysis in Storage Tank as per API 650 | Eurocode

CONFIDENTIAL

Send Enquiry
Stress & Flexibility Analysis, Desalination Plant - GRP | ISO 14692

Stress & Flexibility Analysis, Desalination Plant - GRP | ISO 14692

CONFIDENTIAL

Send Enquiry
Forensic Engineering. API 650 Storage Tank Bulging Analysis

Forensic Engineering. API 650 Storage Tank Bulging Analysis

CONFIDENTIAL

Send Enquiry
Venting req's of 15 Storage Tanks as per API 650 | API STD 2000

Venting req's of 15 Storage Tanks as per API 650 | API STD 2000

CONFIDENTIAL

Send Enquiry
Design & Fatigue Verification of H2 Reactor | ASME VIII Div.2 + FEA

Design & Fatigue Verification of H2 Reactor | ASME VIII Div.2 + FEA

CONFIDENTIAL

Send Enquiry
Waterhammer & Supports verification, Firefighting | CAESAR II

Waterhammer & Supports verification, Firefighting | CAESAR II

CONFIDENTIAL

Send Enquiry
Forensic Engineering | API 650 Storage Tank Failure

Forensic Engineering | API 650 Storage Tank Failure

CONFIDENTIAL

Send Enquiry
Structural Supports, Welds & Anchor Bolts Verification | FEA

Structural Supports, Welds & Anchor Bolts Verification | FEA

CONFIDENTIAL

Send Enquiry
Smoke Duct P1-DU-0001 Pressure Loss Analysis

Smoke Duct P1-DU-0001 Pressure Loss Analysis

CONFIDENTIAL

Send Enquiry
Re-rate of S&T Heat Exchanger E-0502 | PD5500

Re-rate of S&T Heat Exchanger E-0502 | PD5500

CONFIDENTIAL

Send Enquiry
5 Structural Supports, Welds & Anchor Bolts Verification | FEA

5 Structural Supports, Welds & Anchor Bolts Verification | FEA

CONFIDENTIAL

Send Enquiry
Trunnions design & Calc's of FCC Reactor | ASME VIII Div.2 + FEA

Trunnions design & Calc's of FCC Reactor | ASME VIII Div.2 + FEA

CONFIDENTIAL

Send Enquiry
PARACOX QC LABORATORY Project Coordination

PARACOX QC LABORATORY Project Coordination

CONFIDENTIAL

Send Enquiry
Calc's & Verification of large S&T Heat Exchanger | EN 13445

Calc's & Verification of large S&T Heat Exchanger | EN 13445

CONFIDENTIAL

Send Enquiry
Internal & External pressure calc of components | ASME VIII Div.1

Internal & External pressure calc of components | ASME VIII Div.1

CONFIDENTIAL

Send Enquiry
Waterhammer & Supports verification, Firefighting | CAESAR II

Waterhammer & Supports verification, Firefighting | CAESAR II

CONFIDENTIAL

Send Enquiry
Design & Calc's of Expansion Loops for Fumes Tower | ASME B31.3

Design & Calc's of Expansion Loops for Fumes Tower | ASME B31.3

CONFIDENTIAL

Send Enquiry
Detailed Engineering of 3 Biphasic Separators

Detailed Engineering of 3 Biphasic Separators

CONFIDENTIAL

Send Enquiry
Design | Calc's of Propane Pressure Vessel

Design | Calc's of Propane Pressure Vessel

CONFIDENTIAL

Send Enquiry
Stress & Flexibility Analysis of 14 Piping Systems

Stress & Flexibility Analysis of 14 Piping Systems

CONFIDENTIAL

Send Enquiry
Decommissioning Spec of a Fuel Storage Tank

Decommissioning Spec of a Fuel Storage Tank

CONFIDENTIAL

Send Enquiry
Aluminium Pressure Vessel Design and Calc

Aluminium Pressure Vessel Design and Calc

CONFIDENTIAL

Send Enquiry
Stress & Flexibility Analysis of Steam System

Stress & Flexibility Analysis of Steam System

CONFIDENTIAL

Send Enquiry
Design & Calculation of a Separation Filter

Design & Calculation of a Separation Filter

CONFIDENTIAL

Send Enquiry
Molten Salts Storage Tank Design & Calculation

Molten Salts Storage Tank Design & Calculation

CONFIDENTIAL

Send Enquiry
Design | Fatigue Verification of H2 Reactor

Design | Fatigue Verification of H2 Reactor

CONFIDENTIAL

Send Enquiry
Flexibility & Stress Analysis of Air System

Flexibility & Stress Analysis of Air System

CONFIDENTIAL

Send Enquiry
Design | Fab dwg's of API 650 Anchor Bolts

Design | Fab dwg's of API 650 Anchor Bolts

CONFIDENTIAL

Send Enquiry
Performance Optimization in Drying System

Performance Optimization in Drying System

CONFIDENTIAL

Send Enquiry
Design | Calc of API 650 Aboveground Storage Tanks

Design | Calc of API 650 Aboveground Storage Tanks

CONFIDENTIAL

Send Enquiry
Design | Calculation of ASME VIII Filters

Design | Calculation of ASME VIII Filters

CONFIDENTIAL

Send Enquiry
Design of Fuel Separator for Replacement

Design of Fuel Separator for Replacement

CONFIDENTIAL

Send Enquiry

Challenge · Approach · Outcome

Seven engineering case studies from the SLETEC portfolio

High-SG Liquid in an Existing Tank
Ref. 79 · STORAGE TANK

High-SG Liquid in an Existing Tank

Challenge: Confirm the safe filling height when an existing Ø6,096 mm, 5.3 mm-shell vertical tank stores a 1.83 SG fluid.

Approach: Static-structural FEA of the shell under hydrostatic pressure gradient, with deformation and stress review against the target stress level.

Outcome: Filling height of 4,450 mm established at a maximum shell stress of 48.02 MPa — a clear operating limit for the owner.

Scaffold Access Through a Tank Roof
Ref. 77 · ACCESS SAFETY

Scaffold Access Through a Tank Roof

Challenge: Verify a scaffold arrangement entering through a roof manhole without overloading the dome roof.

Approach: FEA of roof and scaffold interface under gravity, wind and scaffold reactions; global equilibrium and reaction checks.

Outcome: Max vertical deformation +0.51 mm with total support reaction ≈ 4.90 × 10⁴ N — access approved within serviceability limits.

Fire water pump skid vibration – FEA model of the stiffened base frame with deformation contours
Ref. 81 · VIBRATION

Fire Water Pump Skid Vibration

Challenge: Address vibration concerns on a diesel-engine-driven fire water pump skid base frame.

Approach: Equipment-weight static, modal and harmonic FEA under combined engine and pump excitation; stiffening options modelled.

Outcome: Stiffening design proposed with site-verification recommendations for vibration acceptance.

Tank Shell, Bottom & Roof Repair
Ref. 01 · 02 · REPAIR

Tank Shell, Bottom & Roof Repair

Challenge: Restore an in-service storage tank with damaged shell plates, bottom and roof structure.

Approach: Repair methodology with localised shell replacement, temporary internal supports and FEA of temporary stiffening, stability and wind.

Outcome: Controlled repair package with procedures and calculations for safe execution and return to service.

Adsorber Cyclic-Service Fatigue
Ref. 80 · ASME VIII DIV. 2

Adsorber Cyclic-Service Fatigue

Challenge: Demonstrate the fatigue life of an adsorber subject to repeated pressure cycling and nozzle loads.

Approach: Fatigue assessment to ASME VIII Division 2 using FEA of shell, nozzles and welds under cyclic pressure.

Outcome: Fatigue evaluation documented against the agreed criteria, supporting the vessel’s cyclic-service approval.

Silo Top-Filter Congestion Risk
Ref. 05 · CFD

Silo Top-Filter Congestion Risk

Challenge: Check whether material recirculation during loading could congest the silo top filter.

Approach: Transient CFD with particle tracking of the loading process and recirculation review.

Outcome: No material recirculation at the silo top — the top filter is safe from particle congestion.

Oblique Impact on a Bolted Armor Plate Assembly
Ref. 82 · EXPLICIT DYNAMICS

Oblique Impact on a Bolted Armor Plate Assembly

Challenge: Predict the damage to a two-plate Steel 4340 bolted assembly struck by a projectile at 800 m/s at an oblique angle.

Approach: Ansys Explicit Dynamics with element erosion, refined 40 mm impact-zone mesh and bolted-joint representation; deformation, stress and plastic-strain review over 0.15 ms.

Outcome: Full perforation of both plates within 0.15 ms; peak von Mises stress 1.23 GPa; maximum equivalent plastic strain 0.968, with damage localised to the impact zone.

Selected Project References

82 engineering references, grouped by discipline

Storage Tanks · 22

  • 01Engineering package for shell stress analysis and plate repair
  • 02Repair method for tank bottom, roof plates and roof structure
  • 04Vacuum residue storage tank detailed-engineering package
  • 08Floating-roof collapse investigation and verification
  • 11Preliminary design of large bilocular storage tank
  • 12Tank bulging assessmentAPI 650 / API 653
  • 16Storage-tank mechanical calculation and FEAFEA
  • 20Inspection, alteration and repair technical scopeAPI 653
  • 22Aboveground-tank inspection and tolerance validationAPI 653
  • 34Floating-roof detailed engineering and tolerancesAPI 650 / API 653
  • 40Water-storage-tank design verification and FEAFEA
  • 43Storage-tank bottom-replacement supervision
  • 45Storage-tank loading analysisAPI 650 / Eurocode
  • 47Forensic tank bulging assessmentAPI 650
  • 48Venting evaluation for multiple storage tanksAPI 2000
  • 51Forensic storage-tank failure investigationAPI 650
  • 65Fuel-storage-tank decommissioning specification
  • 69Molten-salt storage-tank design
  • 72Anchor-bolt design and fabrication drawingsAPI 650
  • 74Aboveground storage-tank designAPI 650
  • 77Roof-manhole scaffold verificationAPI 650
  • 79High-SG hydrostatic tank-shell analysis

Static Equipment · 19

  • 09Oxygen filter design verification and finite-element analysisFEA
  • 10Pressure-vessel calculation and specification review
  • 13Mechanical design and compliance verificationEN 13445
  • 15Pig-trap mechanical designASME VIII
  • 19Pressure-vessel component and separator calculations
  • 26Seven pressure-vessel filtersEN 13445
  • 31Five pressure vessels - calculations and detailed engineering
  • 44Two pressure vessels - verificationASME VIII
  • 49H2 reactor fatigue verificationASME VIII Div. 2
  • 56FCC reactor transition design and FEAASME VIII Div. 2
  • 59Internal/external-pressure component calculations
  • 62Detailed engineering of biphasic separators
  • 63Propane pressure-vessel design and calculations
  • 66Aluminium pressure-vessel design
  • 68Separation-filter design and calculation
  • 70H2 reactor design and fatigue verification
  • 75Filter design and calculationASME VIII
  • 76Replacement fuel-separator engineering
  • 80Adsorber fatigue analysisASME VIII Div. 2

Piping · 11

  • 30Steam-piping flexibility and support analysisASME B31.1
  • 37Special piping-support design - refineryEurocode 3
  • 41Steam-piping flexibility and support verification
  • 42Steam-system stress and flexibility analysis
  • 46Desalination-plant GRP stress analysisISO 14692
  • 50Firefighting waterhammer and support verification
  • 60Firefighting waterhammer and support analysis
  • 61Fume-tower expansion-loop designASME B31.3
  • 64Stress analysis of fourteen piping systems
  • 67Steam-system stress and flexibility assessment
  • 71Air-system flexibility and stress analysis

Heat Exchangers · 10

  • 18Shell-and-tube BEM exchanger thermal design
  • 21Heat-exchanger bellows replacementTEMA / ASME
  • 24High-temperature cooler thermal-mechanical design
  • 27Shell-and-tube exchanger stress assessmentASME VIII Div. 2
  • 32Heat-exchanger nozzle-load assessmentWRC 537
  • 33Shell-and-tube exchanger static and fatigue assessment
  • 36Shell-and-tube exchanger thermal and mechanical analysis
  • 38Shell-and-tube exchanger designTEMA / ASME VIII
  • 54Shell-and-tube exchanger reratingPD 5500
  • 58Large shell-and-tube exchanger verificationEN 13445

Analysis (FEA/CFD) · 8

  • 14Creep and fatigue analysis of furnace return bend
  • 17Coke-drum lifting-device detailed FEAFEA
  • 25Converter drive-train thermal-mechanical FEAFEA
  • 28Compressor-silencer static and fatigue verification
  • 29Flange local-failure, plastic-collapse and fatigue analysis
  • 53Industrial smoke-duct pressure-loss analysis
  • 73Drying-system performance optimization
  • 82Oblique impact analysis of a bolted armor plate assemblyExplicit Dynamics

Structural & Civil · 5

  • 39Bolted-structure calculation and verification
  • 52Structural supports, welds and anchor-bolt FEAFEA
  • 55Structural-support and anchor-bolt verification
  • 78Fall-protection anchor structural verification
  • 81Fire water pump skid vibration assessment and stiffening designModal / harmonic FEA

Plant & Structural · 2

  • 06Wet concrete batching plant engineering package
  • 57Laboratory-facility engineering coordination

Risk & Safety Studies · 2

  • 23HAZOP/FMEA study of voltage-regulation systemHAZOP / FMEA
  • 35Voltage-regulation-system HAZOP and FMEAHAZOP / FMEA

Reverse Engineering · 1

  • 03Reverse engineering and structural analysis of industrial chassis

Silos & Bulk · 1

  • 05Multi-silo storage system - structural and CFD verification

Inspection & FFS · 1

  • 07Fitness-for-service assessmentAPI 579 / ASME FFS-1

A curated selection — not SLETEC's complete project history. Many client-sensitive engagements are omitted in accordance with confidentiality and NDA obligations.

View the full Engineering Portfolio

Detailed Case Studies

Engineering Case Studies

In-depth technical reviews of selected engineering projects with scope, methodology and deliverables

Have a Project in Mind?

Our engineering specialists are ready to evaluate your requirements and deliver a compliant, precision-grade engineering package.

Start a Discussion