Engineering Service

API 579 Fitness for Service, Fatigue and Remaining Life Assessment

SLETEC performs API 579 fitness for service assessments to decide whether corroded, pitted, dented, bulged or cracked equipment can stay in service, at what pressure or fill height, and until when.

Corrosion, metal loss, pitting, dents, bulges or cracks do not always mean replacement. A fitness-for-service (FFS) assessment shows whether equipment can stay in service, at what pressure and for how long.

SLETEC performs API 579-1/ASME FFS-1 Level 1, 2 and 3 assessments, remaining life calculations to API 510, 570 and 653, fatigue analysis to ASME VIII Div. 2 and BS 7608, and fracture mechanics using FEA.

Fixed-price quote in 24 hoursSmall jobs welcomeAPI · ASME · AISC · Saudi Aramco

Last updated:

Request Engineering Support

Typical response within 24 hours · Confidentiality assured

What we calculate (Tank, Vessel and Heat Exchanger Calculations)

API 650 shell, bottom and roof design

tank thickness calculation (API 650, AMETank / Excel)

Wind girder, overturning and seismic design

tank wind and earthquake check (API 650 Annex E)

API 653 minimum thickness, remaining life and repair

tank repair calculation (API 653)

Tank venting calculation

tank vent size (API 2000)

Tank settlement evaluation

tank settlement check (API 653 Annex B)

ASME VIII Div. 1 shell, head and nozzle design

vessel thickness calculation (PV Elite / COMPRESS)

MAWP, MDMT and hydrotest pressure

vessel max pressure (ASME VIII)

Nozzle reinforcement and pad design

nozzle reinforcement (ASME VIII UG-37)

Zick saddle analysis, skirt and leg supports

saddle / skirt / leg check (ASME VIII, Zick method)

Wind and seismic loads on vessels and columns

vessel wind and seismic (ASCE 7, SBC 301)

Mechanical design to TEMA and ASME VIII

heat exchanger calculation (TEMA, PV Elite)

Tubesheet and expansion joint design

tubesheet calculation (ASME VIII UHX, TEMA)

Custom flange design

flange design (ASME VIII App. 2)

Remaining life and inspection interval

corrosion / remaining life (API 510, API 570, API 653)

FFS Level 1 / 2 / 3

fitness for service (API 579-1/ASME FFS-1)

Send us your drawings and data on WhatsApp (+966 55 545 8298) or email (enquiry@sletec.com) for a fixed-price quote, usually within 24 hours.

API 579 assessment levels explained

API 579-1/ASME FFS-1 sets out three levels. Each level needs more data and engineering effort but usually removes conservatism, so a component that fails Level 1 may still pass at Level 2 or 3.

The three assessment levels
LevelMethodTypical use
Level 1Screening criteria using limited inspection dataQuick go or no-go on minor damage
Level 2Detailed calculation using thickness profiles and measured damageMost corrosion and pitting cases
Level 3Detailed stress analysis, usually FEABulges, distortion, cracks and complex geometry

Remaining life and corrosion assessment inputs

We need the original design data, recent and previous thickness readings, inspection photos and the operating conditions. With two or more thickness surveys we can set a corrosion rate, then calculate remaining life and the next inspection date.

For tanks with shell bulging or settlement, a Level 3 FEA often gives a clear operating limit. Our tank FEA verification and the API 579 levels guide show what that work involves.

What the FFS report gives the owner

The report states whether the component is acceptable as is, acceptable with a reduced rating or fill height, or needs repair. It also records the future corrosion allowance assumed, so the next inspection can confirm or update it. Where the owner also plans a denser product, the same thickness data feeds a change of service check for a heavier liquid.

Frequently Asked Questions

What is fitness-for-service?

It is an engineering check to decide if damaged equipment is safe to keep running, needs repair, or must be replaced.

What data do you need?

Design drawings, inspection thickness data, photos of the damage and operating conditions.

Can you calculate remaining life?

Yes. We calculate remaining life and next inspection date from corrosion rates.

Send your sketch, photo or PDF today

One drawing or a complete design package — we reply with a fixed-price quote, usually within 24 hours.

Request Engineering Support

Typical response within 24 hours · Confidentiality assured