Equipment Design

Pressure Vessel Design – Calculations, 3D Model and Fabrication Drawings

Our pressure vessel design calculation packages take a process data sheet to a code-compliant vessel that an authorised inspector can review and a workshop can fabricate. Each package covers shell, heads, nozzles, flanges, supports and test pressure.

We design pressure vessels of all types with PV Elite / COMPRESS calculations, nozzle reinforcement, saddle and skirt checks, GA and fabrication drawings, and FEA where needed.

Also searched as: pressure tank, vessel drawing, vessel calculation.

Fixed-price quote in 24 hoursSmall jobs welcomeAPI · ASME · AISC · Saudi Aramco

Last updated:

Request Engineering Support

Typical response within 24 hours · Confidentiality assured

SLETEC portfolio

Project Evidence — ASME Vessels, Exchangers & Static Equipment

Selected engineering evidence from SLETEC projects. Client names and identifiers are withheld for confidentiality.

Pressure-Vessel Local FEANozzle, connection and local-stress verification of an exchanger shell and supports.
ASME VIII Div. 2 Adsorber FatigueCyclic pressure, nozzle loads, weld stress and fatigue-life assessment.

Scope

Vessels, separators, filters, reactors, exchangers, lifting devices

Codes

ASME VIII Div. 1 & 2 · TEMA · EN 13445 · PD 5500

Deliverables

Design calcs, data sheets, FEA and fatigue reports

Send us your data sheet, sketch or old drawing on WhatsApp (+966 55 545 8298) or email (enquiry@sletec.com) for a fixed-price quote, usually within 24 hours.

What an ASME VIII Div 1 calculation covers

Div. 1 uses design-by-rule, so the report walks through each rule in turn. Reviewers look for these checks by name, and we lay the report out so each one is easy to find.

Main checks in a Division 1 report
CheckWhat it confirms
Vessel thickness calculation (UG-27, UG-32)Cylindrical shell and head thickness for internal pressure plus corrosion allowance
External pressure (UG-28)Shell and stiffening rings under vacuum or jacket pressure
Nozzle reinforcement (UG-37, UG-45)Area replacement around openings and minimum nozzle neck thickness
MDMT (UCS-66)Whether impact testing is required at the minimum design metal temperature
SupportsSaddles by the Zick method, or skirt and base ring for wind and seismic
Hydrostatic test (UG-99)Test pressure and the shell stress during the test

Typical inputs

We work from the process data sheet: design pressure and temperature, volume, fluid, corrosion allowance, joint efficiency or radiography level, and the nozzle schedule. Site wind and seismic data, insulation, platform loads and any external nozzle loads complete the input. Missing items are listed as assumptions in the design basis rather than guessed silently.

What goes on the pressure vessel drawings

The GA shows design data, the nozzle schedule with orientation, weld details, test pressure and nameplate. Detail drawings cover nozzle projections, reinforcing pads, saddles or skirt, lifting lugs, internals and platform clips. Our pressure vessel local stress project shows the FEA we add when nozzle loads or supports fall outside rule-based limits.

How a vessel job runs

We confirm the design basis and code edition first, then issue the calculation and GA for comment. Once the nozzle orientation and supports are agreed, detail drawings and the bill of materials follow. Comments from your inspector or client are closed out in a revised issue with every change clouded and listed in the revision table.

Frequently Asked Questions

Can you design a pressure vessel for our project?

Yes. We prepare calculations and drawings to ASME VIII Div. 1 / Div. 2 and your project specification.

Do you take small jobs?

Yes. Single drawings, one calculation or a check of an existing design are welcome.

Which countries do you serve?

Saudi Arabia, UAE, Qatar, Oman, Kuwait, Bahrain and worldwide.

Send your sketch, photo or PDF today

One drawing or a complete design package — we reply with a fixed-price quote, usually within 24 hours.

Request Engineering Support