Engineering guide
SBC 301 Wind Load on Industrial Structures in Saudi Arabia
SBC 301 wind load calculation is required for most structures built in Saudi Arabia, from buildings to pipe racks, tanks, stacks and open-frame process structures. This guide explains how the Saudi Building Code's loads part is applied to industrial structures, what inputs are needed, where owner specifications add requirements and the mistakes that most often appear in wind calculations.
Last updated:
Where SBC 301 sits in the Saudi Building Code
The Saudi Building Code is a set of parts covering different subjects, and SBC 301 is the part dealing with loads and forces. It defines dead, live, wind, seismic and other loads and the load combinations used with the material design parts for concrete and steel.
The wind provisions of SBC 301 are closely based on the ASCE 7 approach, with Saudi-specific wind speed data and requirements. Engineers familiar with ASCE 7 will recognise the structure, but should work from the edition of SBC 301 named in the project, not from ASCE 7 directly, because the wind map, factors and some provisions can differ.
Inputs needed for a wind calculation
Most of the effort in a wind calculation goes into getting the inputs right. Once they are fixed, the pressure calculation is routine.
The risk category deserves particular attention on process plants. A structure whose failure could release hazardous material, or stop an essential facility, is usually placed in a higher category than an ordinary building of the same size, which increases the design wind load. Owner specifications often state the category to be used for each type of structure.
| Input | What to confirm |
|---|---|
| Basic wind speed | From the SBC 301 map for the site, or the project site data where the owner prescribes a value |
| Risk category | Based on the consequence of failure; many process structures are assigned a higher category |
| Exposure category | Surface roughness around the site, often open or coastal for industrial plots |
| Topographic factor | Hills, escarpments or embankments near the structure |
| Directionality and gust factors | Per the code; flexible structures need a dynamic gust factor |
| Structure geometry and solidity | Projected areas, piping and cable trays on racks, platforms and equipment |
| Force or pressure coefficients | From the code or recognised guidance for the shape |
Exposure and site conditions in Saudi Arabia
Industrial plants are usually on open, flat ground with few obstructions, which places them in the more severe exposure categories. Coastal sites such as those around Jubail, Ras Tanura, Dammam, Yanbu and Jeddah may face open water in one or more directions, and the exposure category should reflect the most severe upwind terrain for each wind direction considered.
Owner specifications often prescribe site data. On Saudi Aramco projects, meteorological and design data are normally taken from the applicable Saudi Aramco engineering standard and the project site data, and these values should be stated in the design basis so every calculation uses the same figures.
Inland industrial cities are not automatically less exposed. Large, open desert plots offer little roughness to slow the wind, so the exposure category should be chosen from the actual surroundings rather than from distance to the coast.
Applying wind loads to industrial structures
Buildings are handled by the main provisions for enclosed or partially enclosed structures. Most industrial structures, however, fall under the provisions for other structures, such as open frames, tanks, chimneys, signs and lattice structures, where wind force is calculated from a force coefficient and a projected area.
Pipe racks and open-frame structures are the hardest case, because the projected area includes structural members, piping, cable trays, platforms and equipment, with partial shielding between frames. Many projects use the ASCE guideline on wind loads for petrochemical and other industrial facilities for these structures, applied with the SBC 301 wind speed and factors. Whatever method is used, it should be stated and applied consistently.
Vertical vessels, stacks and chimneys need checks for along-wind load and, where they are slender, for across-wind response and vortex shedding. Large storage tanks need wind checks for the shell stability when empty, for overturning and anchorage, and for roof uplift; API 650 contains its own wind provisions that are used with the site wind speed.
- Pipe racks: transverse wind on piping and trays, longitudinal wind on frames, shielding factors
- Open-frame structures: wind on members, equipment and platforms at each level
- Vertical vessels and stacks: along-wind load, gust factor and vortex-shedding check where slender
- Storage tanks: empty-shell stability, overturning, anchorage and roof uplift
- Equipment on structures: local wind on exchangers, air coolers and drums
Load combinations and other checks
Wind loads are combined with dead, live, operating and other loads using the combinations in SBC 301, either strength (factored) or allowable stress combinations depending on the material design method. Wind and seismic are not normally combined with each other, but both must be checked, and for light, tall structures wind often governs.
Serviceability matters too. Drift limits for structures supporting piping or sensitive equipment, deflection at the top of stacks and the effect of wind on rotating equipment alignment may be set by the owner's specification rather than the code.
Construction and erection stages need their own wind checks. Partly erected frames, tall vessels set on foundations before their piping and platforms are connected, and empty tanks during hydrotest preparation can all be more vulnerable to wind than the completed structure.
Common mistakes
Most of these errors make the design unconservative. A reviewer can catch them quickly by reading the design basis and the projected-area assumptions before checking the arithmetic.
- Using an ASCE 7 wind map speed instead of the SBC 301 or project-prescribed value
- Choosing a sheltered exposure category for a plant on open ground or near the coast
- Assigning too low a risk category to structures whose failure would cause a process release
- Calculating wind on bare steelwork only and omitting piping, trays, platforms and equipment
- Applying full shielding on pipe racks without justification
- Skipping the dynamic or vortex-shedding check on slender stacks and columns
- Mixing strength and allowable stress load combinations within one design
When to involve a specialist
Simple buildings and small structures are routinely handled by general structural engineers. Specialist input is useful for tall or slender structures, complex pipe racks with heavy piping, structures where wind and seismic interact with equipment loads, and checks on existing structures being modified or re-assessed.
Re-assessment of existing structures is a common case. Adding piping to an old pipe rack, mounting new equipment on an existing platform or extending a structure can all increase wind area beyond what the original design assumed, even where the gravity load change looks small.
SLETEC prepares wind and seismic load calculations for industrial structures to SBC 301 and the project specification. See our seismic and wind load analysis service, our pipe rack structural design service and our tank FEA verification case study for related work.
Frequently asked questions
Is SBC 301 the same as ASCE 7?
No. SBC 301 is closely based on the ASCE 7 approach, but it is a Saudi document with its own wind speed data and some different provisions. Projects in Saudi Arabia should work from the edition of SBC 301 named in the contract.
Which exposure category applies to an industrial plant?
Most plants sit on open, flat ground, which usually places them in one of the more severe exposure categories. Coastal sites facing open water may need the most severe category for some wind directions. The choice should be justified from the actual upwind terrain.
How is wind calculated on a pipe rack?
Wind force is calculated from the projected area of structural members, piping, cable trays and platforms, with force coefficients and, where justified, shielding factors. Many projects follow the ASCE guideline for petrochemical facilities, applied with the SBC 301 wind speed and factors.
Do owner specifications override SBC 301 wind speeds?
Owner specifications can prescribe site wind data or require higher values, and these must be followed where they are more demanding. They do not remove the obligation to meet the building code. The governing values should be stated in the design basis.