Engineering service

Saudi Aramco Standards Engineering to SAES, SAMSS and SAEP

SLETEC provides Saudi Aramco standards engineering for contractors and fabricators who must show that their designs, calculations and drawings follow SAES, SAMSS and SAEP requirements alongside the project specification. We prepare the deliverables and the compliance evidence; acceptance of those deliverables remains with Saudi Aramco and the contractor's own review process.

Last updated:

What designing to Aramco standards involves

Saudi Aramco projects are governed by a layered set of documents. Engineering Standards (SAES) set mandatory design requirements, Materials System Specifications (SAMSS) set requirements for purchased equipment and materials, and Engineering Procedures (SAEP) describe how certain engineering activities are carried out and documented. Standard drawings, forms and the project specification sit alongside these.

In most cases the SAES or SAMSS adopts an international code, such as ASME Section VIII, API 650 or ASME B31.3, and then adds, deletes or tightens clauses. Designing to Aramco standards therefore means applying the international code and every applicable supplement together, and showing clearly which rule governed each decision.

How compliance is shown in deliverables

Reviewers on Aramco projects look for traceability. A calculation that gives the right answer but does not say which standard and revision it follows will usually come back with comments. We build compliance evidence into the documents from the start, rather than adding it at the end.

The aim is that a reviewer can pick any number in a calculation and trace it back to an input, a standard and a revision without asking. That reduces review cycles, which is usually where schedule is lost on specification-heavy projects.

  • Design basis listing every SAES, SAMSS and SAEP used, with revision, plus the international codes they invoke
  • Calculations with the governing clause or supplementary requirement referenced next to each check
  • Datasheets prepared on the project or Aramco format required by the contract, with design conditions matching the calculations
  • Compliance matrices that list each requirement and state comply, exception or not applicable, with a reference to where it is addressed
  • Clarification and deviation registers that keep exceptions visible until they are resolved
  • Comment-response sheets that close each reviewer comment against a revised document

What we do not claim

SLETEC does not hold, and does not claim, any approved, registered or pre-qualified status with Saudi Aramco, and does not appear on Saudi Aramco's vendor lists. Our role is to prepare engineering that is designed to SAES and SAMSS requirements and the client's project specification, so that the contractor or manufacturer can submit it through their own qualified channels.

Where a project requires the engineering firm itself to be pre-qualified, that requirement sits with the contracting party. We support registered contractors and manufacturers as an engineering subcontractor working under their quality system and document numbering.

This distinction matters at bid stage. If an invitation to bid requires the design office to hold a particular status, the contractor should confirm that before engaging any subcontractor, and we will say plainly what we can and cannot provide.

Typical scopes on Aramco-specification projects

Most of our work on these projects is mechanical, structural and static-equipment engineering for packages and plant modifications. The same disciplines apply as on any project, with the added layer of Aramco supplements and document formats.

Typical scopes and the documents that usually apply
ScopeTypical Aramco documents involvedInternational base code
Pressure vesselsPressure-vessel SAES and SAMSSASME Section VIII
Atmospheric storage tanksTank SAES and SAMSSAPI 650 / API 653
Piping and supportsSAES-L seriesASME B31.3
Structures and foundationsSAES-M and SAES-Q series, site data per SAES-A-112SBC, ACI, AISC
Skids and packagesPackage SAMSS plus the discipline SAESSeveral, by component

Working from the correct revision

Aramco standards are revised regularly, and the edition that governs is normally the one named in the contract or purchase order, not the latest one. We work from copies supplied by the client under the project and record the revision in the design basis. If a newer revision changes a requirement during the job, we raise it as a query rather than switching silently.

Site data is handled the same way. Wind speed, seismic parameters, ambient temperatures and soil data come from the project's site data or the relevant SAES, and are listed in the design basis so that every calculation uses the same values.

Where the client's document set is incomplete, for example a referenced SAMSS has not been supplied, we list the missing documents at the start of the job rather than working around them.

Exceptions, deviations and waivers

Not every requirement can be met on every job, especially in brownfield work where existing equipment was built to older standards. When a requirement cannot be met, we document the reason, the proposed alternative and its technical justification, so the contractor can raise a deviation or waiver request through the project procedure.

Keeping exceptions in a register avoids the common problem of a non-compliance surfacing late, at final review or during inspection. It also gives the reviewer a single place to see what is still open.

Typical items on such a register include material substitutions where the specified grade is not available in time, existing nozzle or flange ratings that differ from the current standard, and fabrication details on proven vendor designs. Each entry carries the requirement, the proposed alternative, the justification and its status.

How a typical job runs

We start by reviewing the project specification, the list of applicable standards and the inputs, and return a design basis and clarification list for agreement. Engineering then proceeds with three-level checking on every issue: self-check, independent check and approval. Documents are numbered, revision-tracked and transmitted to suit the contractor's document control system.

In Saudi Arabia, in-Kingdom contracting, client interface and site coordination are handled through our KSA Delivery Partner, Advanced Times General Contracting Co., Riyadh, while engineering is carried out at our India Engineering Center in Tiruchirappalli. For related support, see our EPC engineering support and static equipment design services, or our guide on designing to SABIC specifications.

Frequently asked questions

What is the difference between SAES, SAMSS and SAEP?

SAES are Saudi Aramco Engineering Standards that set mandatory design requirements. SAMSS are Materials System Specifications that govern purchased equipment and materials. SAEP are Engineering Procedures that describe how specific engineering activities are performed and documented.

Does SLETEC hold any status with Saudi Aramco?

No. SLETEC does not claim any approved, registered or pre-qualified status with Saudi Aramco. We prepare engineering designed to SAES and SAMSS requirements and the project specification, and the qualified contractor or manufacturer submits it through their own channels.

How do you show compliance with Aramco standards in a calculation?

Each calculation lists the governing standards and revisions in its design basis and references the relevant clause or supplementary requirement beside each check. A compliance matrix then summarises every requirement as comply, exception or not applicable, with a pointer to where it is addressed.

Which revision of an Aramco standard should be used?

Normally the revision named in the contract or purchase order, not necessarily the latest one. We record the revision in the design basis and raise a query if a later revision changes a requirement during the job.

Discuss your project with an engineer

Send drawings, datasheets or a short scope – an engineer replies with scope, schedule and price, usually within 24 hours.