Method Statements

Method Statement (MOS) Preparation Services

Professional method of statement preparation for construction, installation, maintenance, and commissioning activities — supporting permit-to-work and contractor submittal requirements across Saudi Arabia.

SLETEC Engineering prepares Method of Statement (MOS) documents for construction, installation, maintenance, and commissioning activities on oil & gas, petrochemical, and industrial projects across Saudi Arabia. Our method statements are structured technical documents that describe, step-by-step, how a specific activity will be planned and executed — covering personnel and equipment requirements, sequencing, HSE hazards and controls, permit-to-work requirements, and quality hold points.

Clients require method statements as part of permit-to-work packages, contractor pre-qualification submissions, and engineering technical submittals for Saudi Aramco, SABIC, and other major operators. SLETEC method statements are written by engineers with direct site experience, ensuring the described methodology is practical, technically accurate, and meets the expectations of the client's HSE and engineering review teams.

Our MOS preparation scope covers structural steel erection, pressure vessel and equipment installation, pipe spool installation and testing, tank erection and hydrotest, rotating equipment alignment and installation, scaffold erection, hot tapping and in-service connection operations, and maintenance activities on static and rotating equipment. Each method statement is reviewed internally for technical accuracy and HSE completeness before client submission.

Engineering documentation prepared with reference to API, ASME, AISC, AWS, ISO, Saudi Aramco, SABIC and client project specifications where applicable.

Request Engineering Support

Typical response within 24 hours · Confidentiality assured

Service Capabilities

Construction method statements — structural erection, civil works, piling
Equipment installation method statements — static and rotating equipment
Pipe spool installation and hydrostatic pressure test method statements
Tank erection and hydrotest method statement preparation
Hot tapping and in-service welding method statements
Rotating equipment alignment, installation, and commissioning MOS
Scaffold erection and dismantling method statements
Maintenance and turnaround activity method statements

Deliverables Produced

Method of Statement (MOS) Document — step-by-step activity description
Resource Plan — manpower, equipment, and tools required
Hazard Identification and Risk Assessment (integrated within MOS)
Permit-to-Work Requirements Summary
Quality Inspection and Hold Point Plan (ITP reference)
Emergency Response and Contingency Procedure Section
Reference Drawing and Specification List

Standards Referenced

Saudi Aramco SAEP (Engineering Procedures) ASME B31.3 (Pressure Testing reference) API 650 (Tank Erection and Hydrotest reference) OSHA Standards (HSE reference) Client Project HSE Management Plan Client ITP and Quality Requirements

Software Used

Microsoft Word (MOS Document Preparation) Microsoft Excel (Resource and Schedule Tables) AutoCAD (Sketch Drawings for MOS Illustrations) Microsoft Project (Phasing and Sequence Diagrams)

Industries Served

Oil & Gas Petrochemical Refinery Power Generation Water Treatment Industrial Construction Offshore & Marine

Why Choose SLETEC

Method statements written by engineers with real site experience — practically accurate and technically credible for client HSE and engineering review.

Integrated HSE content with hazard identification, controls, and permit-to-work requirements — no separate HSE supplement needed.

Fast turnaround for urgent permit-to-work situations — standard MOS documents delivered within 2-5 working days.

Experience preparing MOS documents that meet Saudi Aramco GI, SAEP, and contractor submittal requirements.

Multi-discipline MOS capability — structural, mechanical, piping, and rotating equipment activities covered by the same team.

Frequently Asked Questions

What is a Method of Statement (MOS) in oil & gas projects in Saudi Arabia?

A Method of Statement (MOS), also called a Method Statement, is a structured technical document that describes step-by-step how a specific construction, installation, maintenance, or commissioning activity will be safely and correctly carried out. In Saudi Aramco and SABIC projects, MOS documents are required for permit-to-work approval, subcontractor pre-qualification, and contractor technical submittals.

What types of method statements does SLETEC prepare?

SLETEC prepares method statements for structural steel erection, equipment installation and setting, pipe spool installation and hydrostatic testing, pressure vessel installation and commissioning, tank erection and hydrotest, hot tapping and stopple operations, maintenance activities on rotating equipment, and scaffold erection and dismantling.

Does SLETEC's MOS preparation include HSE and risk assessment content?

Yes. SLETEC method statements include a hazard identification and risk assessment section, referencing project HSE standards and identifying controls, PPE requirements, permit-to-work types required, isolation requirements, and emergency response references. This makes our MOS documents ready for HSE review without requiring separate supplements.

How quickly can SLETEC produce a method statement for a construction activity in KSA?

Standard single-activity method statements typically take 2-5 business days to prepare, depending on the complexity of the operation and availability of reference documents (scope drawings, equipment datasheets, project HSE plan). Complex multi-phase MOS documents for major lifts or commissioning activities are scoped individually.