Engineering guide

How to Choose an Engineering Subcontractor for EPC Projects in Saudi Arabia: a 12-Point Checklist

Outsourcing engineering saves time only when the subcontractor's work goes through client review the first time. Use these twelve checks before you award.

By SLETEC Engineering · Updated 2026-11-06 · 4 min read

The 12 checks

  1. Legal registration. Ask for the company registration number and verify it with the issuing authority. For delivery inside Saudi Arabia, confirm which legal entity will sign the contract.
  2. Relevant evidence. Ask for project references in the same equipment type and code — not just a services list.
  3. Code competence. Check the codes on the references match your scope: API 650/653, ASME VIII, ASME B31.3, AISC 360, the Saudi Building Code and so on.
  4. Client standards. Confirm experience working to Saudi Aramco SAES/SAMSS, SABIC or your owner's specifications, and ask how they are tracked in the design basis.
  5. Independent checking. Ask who checks the work. The checker should not be the originator, and the check should be recorded.
  6. Document control. Look for a document numbering system, revision rules (IFR, IFA, IFC, as-built) and a master document register.
  7. Comment closure. Ask to see a sample comment-response sheet — it shows how they handle your client's review.
  8. Software and licences. Confirm the software for analysis, modelling and drafting, and the file formats you need.
  9. Named team. Ask for the lead engineers' CVs and years of experience in the discipline.
  10. Schedule realism. A credible offer states inputs required, hold points and review periods, not only a delivery date.
  11. Confidentiality. Check NDA acceptance and how client data is stored and accessed.
  12. Communication. Agree a single point of contact, reporting frequency and meeting arrangements in KSA.

Red flags

  • No verifiable registration or no clarity on the contracting entity in KSA.
  • Images in a portfolio that cannot be explained by the engineers who did the work.
  • No independent check, or the checker is the same person as the originator.
  • A fixed delivery date with no list of required inputs.
  • Claims of certifications or approvals that cannot be produced on request.

Questions to ask in the technical clarification meeting

  • Who will be the lead engineer, and which similar packages has that person delivered?
  • How will you capture our client's specifications in the design basis, and how do you show compliance?
  • What inputs do you need from us, and by when, to hold the schedule?
  • How many review cycles are included in the price?
  • How do you handle a technical query that affects scope or cost?
  • What does your comment-response sheet look like, and who closes comments?
  • Which files will we receive — native models and calculations, or PDF only?
  • How is our data stored, and who can access it?

Contract and commercial points

TopicWhat to agree
Contracting entityWhich registered company signs, invoices and carries liability in each country
Scope boundaryA deliverables list with document numbers and revision targets
Inputs and holdsClient inputs with dates; hold points that pause the schedule if inputs are late
Review cyclesNumber of cycles included and client review duration
PaymentMilestones linked to issued deliverables
Intellectual propertyOwnership of drawings, models and calculations after payment
ConfidentialityNDA terms and data handling

How SLETEC answers these checks

  • Registered company: Sky Line Engineering & Technology Private Limited, CIN U71100TN2026PTC199170; KSA contracts through Advanced Times General Contracting Co., C.R. 1010604936. See company facts.
  • 80+ selected project references across tanks, vessels, piping, structures, analysis and reverse engineering. See the Engineering Portfolio.
  • Three-level verification and document numbering SLT-[Project]-[Disc.]-[Type]-[No.] on every deliverable.
  • NDAs accepted; client data on a need-to-know basis.

Frequently asked questions

What should an engineering subcontractor provide with a proposal?
Scope and deliverables list, inputs required, hold points, schedule with review periods, the team, software, quality and document control approach, and commercial terms.
Why is independent checking important?
A recorded check by an engineer who did not prepare the work catches errors before the client review, which reduces comment cycles and schedule risk.
Can an Indian engineering company work on Saudi projects?
Yes. Engineering can be delivered remotely, with contracting and in-Kingdom coordination through a registered Saudi entity, as SLETEC does with its KSA delivery partner.

Start a project

Send your scope, drawings, codes and schedule to enquiry@sletec.com or WhatsApp +966 55 545 8298. An engineer usually replies within 24 hours.

Discuss your project with an engineer

Send drawings, datasheets or a short scope – an engineer replies with scope, schedule and price, usually within 24 hours.